Working party day 2

Published 13:06 on 20 Nov 2021
Once again huge thanks to everyone at the work party today. Huge amount achieved and its looking very tidy for the end of the season.
I think James's chainsaw only stopped during the day to get refuelled or sharpened with a team constantly doing tip runs to clear the brash or top up the log store. The top shed has been cleared with hundreds of trips up and down the hill. We have put some insulation around the water pipe / turned off the water and drained down the boiler and water system. Both of the boat parks have been tidied. There has also been a patch repair of the corner of the clubhouse and some straps attached to the concrete/ bottom shed. More flagstones and levelling has been completed.
We also held a 1 minute silence with some of the work party down by the safety hut.
